What’s Involved in a Full House Renovation From Start to Finish?

October 28, 2025

Introduction

A full house renovation is one of the most rewarding yet complex projects a homeowner can undertake. Whether you’ve purchased an older property in need of transformation or want to modernise your existing home, the process involves far more than paint and plaster. A successful renovation requires careful planning, professional expertise, and a structured approach from concept to completion.

Understanding what’s involved from start to finish helps set realistic expectations, manage costs, and ensure that the finished home aligns perfectly with your vision. From initial design discussions to the final inspection, every stage plays a vital role in shaping the outcome.

What’s Involved in a Full House Renovation From Start to Finish?

1. Assessing the Property and Setting Your Goals

Before any tools are picked up, a clear understanding of the property’s current condition and your renovation goals is essential.

Property Assessment

A professional surveyor or builder should evaluate the structure, foundations, electrics, plumbing, and roof to identify any issues that need addressing before cosmetic or layout changes begin.

Defining the Vision

Decide what you want to achieve. Are you restoring a period home, creating a more open plan layout, or improving energy efficiency? A clear set of priorities will shape your budget and timeline.

Feasibility Study

For larger projects, it’s wise to carry out a feasibility study with an architect or design build firm to confirm what’s possible within local planning rules and your budget.

2. Budgeting and Financial Planning

A well planned budget is the backbone of a successful renovation.

Cost Breakdown

Include everything from construction and materials to professional fees, permits, furnishings, and contingency costs (usually 10 to 15 percent extra).

Funding Options

Homeowners often use savings, remortgaging, or renovation loans. Be sure to secure your financing before beginning any major work to avoid delays.

Transparency

A reputable builder or renovation company will provide a detailed quote outlining each cost element, so there are no surprises along the way.

3. Design and Planning Stage

The design stage shapes how your renovated home will look, feel, and function.

Architectural Design

Work with an architect or designer to create floor plans that reflect your goals. This includes layout adjustments, structural changes, and design features such as extensions, new rooms, or altered elevations.

Interior Design Planning

Select materials, fixtures, lighting, and finishes that align with your vision and lifestyle. The earlier these are chosen, the easier it is to coordinate trades and avoid delays.

Planning Permissions

If your renovation involves major structural changes, extensions, or external alterations, you may need planning permission from your local authority. Listed buildings or properties in conservation areas often require additional approvals.

Building Regulations

Even if planning permission isn’t required, your project must comply with building regulations covering structural integrity, fire safety, insulation, and drainage.

4. Selecting the Right Team

Choosing experienced professionals ensures your project runs smoothly and to standard.

Architect or Designer

They’ll translate your vision into workable plans and coordinate with engineers and local authorities.

Structural Engineer

If your renovation includes removing walls or modifying load bearing structures, a structural engineer’s input is essential.

Builder or Construction Firm

Select a reputable builder with experience in full house renovations. Check credentials, references, and portfolios before signing contracts.

Project Manager

Some homeowners hire a dedicated project manager or work with a design build company that oversees the entire process, ensuring timelines and budgets stay on track.

5. Stripping Out and Preparing the Site

Once planning and permissions are complete, the physical work begins.

Site Preparation

Clear out furniture, fixtures, and non structural elements. In older homes, asbestos checks may be required before demolition.

Demolition and Strip Out

Remove outdated fittings, walls, and damaged materials. Proper waste management and recycling are key at this stage.

Structural Repairs

Address any foundational or structural issues uncovered during the assessment to ensure the property’s stability and safety.

6. Structural Work and Major Construction

This stage brings your new layout and improvements to life.

Extensions and Additions

Building new rooms or extending the footprint requires skilled craftsmanship and adherence to approved plans.

Wall and Floor Work

Walls may be reconfigured or rebuilt. Floors might be levelled, replaced, or upgraded with underfloor heating systems.

Roof Repairs or Replacements

A new roof or insulation upgrade can dramatically improve comfort and energy efficiency.

Windows and Doors

Modern, energy efficient windows and doors enhance both aesthetics and performance.

This is often the longest phase, but once completed, your home begins to take its new shape.

7. Plumbing, Electrical, and HVAC Installation

Before walls are plastered and finishes applied, the internal systems are installed.

Electrical Systems

New wiring, sockets, lighting, and smart home integrations are added according to modern safety standards.

Plumbing and Heating

Replacement of old pipework, installation of new bathrooms or kitchens, and upgrades to central heating or boilers are completed.

Ventilation and Air Conditioning

Proper ventilation prevents moisture build up and ensures good indoor air quality.

Each of these systems must pass inspection before the walls are sealed up.

8. Insulation, Drywall, and Plastering

With the structure and services in place, attention turns to the building envelope and interiors.

Insulation

Adding high quality insulation in walls, floors, and ceilings improves comfort and energy performance.

Drywall and Plastering

Walls are sealed, plastered, and prepared for painting or decorating. This stage starts to give rooms their final shape.

9. Flooring, Joinery, and Finishes

Once the walls are complete, the focus shifts to aesthetic details.

Flooring Installation

Depending on the design, this could include hardwood, tile, stone, or carpet.

Custom Joinery

Built in wardrobes, staircases, skirting, doors, and cabinetry are fitted.

Painting and Decorating

Walls and ceilings are painted, feature walls are added, and decorative finishes are applied throughout.

10. Kitchen and Bathroom Installation

These high value spaces are central to any renovation.

Kitchen Fitting

Cabinets, worktops, appliances, and lighting are installed with attention to functionality and flow.

Bathroom Fitting

Showers, baths, sinks, and tiling are fitted, sealed, and tested to ensure everything works as intended.

Both rooms often require multiple trades working in coordination, so careful scheduling is crucial.

11. Fixtures, Fittings, and Final Details

Lighting Fixtures and Hardware

Switches, handles, and fittings are installed for a polished finish.

Final Plumbing and Electrical Checks

Systems are tested and certified to comply with regulations.

Cleaning and Snagging

The property is deep cleaned, and any small imperfections are corrected during a snagging inspection.

12. Inspection, Certification, and Handover

Once all works are complete

Final Building Control Inspection

A building control officer ensures compliance with approved plans and regulations.

Certificates and Documentation

You’ll receive certificates for electrical, gas, and structural work, along with warranties and guarantees.

Handover

Your builder or project manager provides manuals, warranty information, and maintenance guidance for your newly renovated home.

13. Furnishing and Moving Back In

Once handed over, it’s time to furnish and enjoy your transformed home.

Interior Styling

Arrange furniture, artwork, and décor that enhance the design and functionality of each room.

Final Touches

Adding plants, lighting accents, and soft furnishings helps the property feel complete.

14. Post Renovation Maintenance

A good renovation company will often provide guidance on how to maintain your new home.

Scheduled Inspections

Check for settling cracks, plumbing leaks, or minor electrical issues.

Routine Maintenance

Regular care ensures longevity for finishes, fixtures, and structural components.

Long Term Planning

Keep documentation safe for future projects, insurance claims, or property sales.

Frequently Asked Questions

Q1: How long does a full house renovation usually take?

The timeline depends on the size and scope of the project. Smaller renovations may take three to six months, while larger or structural projects can last nine to twelve months or more. Factors like planning approvals and material availability can also affect schedules.

Q2: Do I need to move out during a full renovation?

For extensive work, especially when structural changes or major systems are being replaced, it’s often safer and more comfortable to move out temporarily. Some homeowners stay during phased projects, but this can slow down progress.

Q3: How can I keep my renovation on budget?

Set a clear budget early, get detailed quotes, and stick to the design plan. Avoid mid project changes and include a contingency fund for unexpected costs.

Q4: Do I need planning permission for a full renovation?

Not always. Internal renovations typically fall under permitted development, but extensions, structural alterations, or exterior changes may require planning permission. Always confirm with your local planning authority.

Q5: What’s the difference between a renovation and a refurbishment?

A refurbishment focuses on aesthetic improvements like decorating or replacing fittings, while a renovation may include structural work, layout changes, and system upgrades that fundamentally transform the home.

Q6: How do I choose the right builder for my renovation?

Look for experience in similar projects, proper accreditations, transparent quotes, and strong references. Always check previous work and ensure they have appropriate insurance and guarantees.

Conclusion

A full house renovation is a journey that blends vision, planning, craftsmanship, and patience. From the initial survey to the final inspection, each stage contributes to creating a home that reflects your style and meets your functional needs.

By understanding what’s involved and working with trusted professionals, you can navigate the process confidently and enjoy the satisfaction of transforming your property into a beautifully renewed living space.

Whether you’re updating a family home or restoring an older property, careful planning, clear communication, and expert execution will ensure your renovation is a success from start to finish.

Ready to bring your home renovation or extension vision to life? At Milkov & Son Construction, we specialise in Architectural Design, Design & Building Process, Loft Extensions & Conversions, Extensions, House Refurbishments, and Interior Design. Whether it’s a single room makeover or a complete transformation, our expert team is here to guide you every step of the way. Contact us online or call +44 7951 625853 to start your project today​​.