Rear extension, loft conversion and whole-house refurbishment
Arlington Road
North London

House extensions in North London
Rear, side return, wraparound, double storey and kitchen extensions — designed, approved and built by one team.
A house extension adds floor area to an existing home by building outwards — to the rear, the side, or both — or upwards over part of the existing footprint. In North London the most common briefs are a full-width rear extension to create a kitchen-dining room on the garden, a side-return infill on a Victorian or Edwardian terrace, and a double-storey extension that adds a bedroom above a larger living space.
Milkov & Son designs, obtains approvals for and builds extensions across Barnet, Harrow, Hertsmere and the surrounding boroughs. This page explains what each type involves, what the planning rules allow, what an extension costs in 2026 and how long it takes, so you can make decisions with real numbers in front of you.

Rear Extensions
Single-storey rear extensions that turn a narrow kitchen into a kitchen-dining room on the garden.

Side Return Extensions
Infilling the passage beside a Victorian or Edwardian terrace to make a wide, bright kitchen.

Wraparound Extensions
Rear and side extensions combined into one L-shaped ground floor — the biggest transformation short of a new house.

Double Storey Extensions
Living space below and a bedroom or bathroom above — the most floor area per pound of any extension.

Kitchen Extensions
Extensions planned around the kitchen: layout, light, services and joinery designed together with the structure.
Each type has its own structural, planning and cost logic. The dedicated pages go into detail; in brief:
Many single-storey extensions in England can be built under permitted development rights without a planning application, provided the house is not a flat, is not in a conservation area with an Article 4 direction, and has not already used its allowance. The key limits, taken from the Planning Portal (Town and Country Planning (General Permitted Development) (England) Order 2015, Class A):
| Rule | Detached house | Semi-detached or terraced |
|---|---|---|
| Single-storey rear extension depth (standard PD) | 4 m | 3 m |
| Single-storey rear depth with prior approval ("larger home extension") | 8 m | 6 m |
| Maximum height, single storey | 4 m (3 m at the eaves if within 2 m of a boundary) | |
| Two-storey rear extension | Max 3 m deep; not within 7 m of the rear boundary; roof pitch to match | |
| Side extension | Single storey, max 4 m high, no wider than half the width of the original house | |
| Total coverage | Extensions and outbuildings may not cover more than 50% of the land around the original house | |
| Materials | Similar in appearance to the existing house | |
"Original house" means the house as first built or as it stood on 1 July 1948. Previous extensions count against the allowance. On designated land — conservation areas such as Hampstead Garden Suburb, Totteridge, Mill Hill and Monken Hadley in Barnet, or Harrow on the Hill — side extensions and two-storey rear extensions need planning permission, and Article 4 directions can remove permitted development altogether. Flats and maisonettes have no permitted development rights for extensions.
Wraparounds, double-storey extensions on most houses, anything on a flat, and anything in an Article 4 area will need a householder planning application (fee £258 in England; the council has eight weeks from validation to decide). Even where a scheme is permitted development we recommend applying for a Lawful Development Certificate (£129) so there is formal proof when you sell or remortgage. We handle all of this as part of the design stage — see architectural design and planning.
Sources: Planning Portal, "Extensions — planning permission"; Planning Portal fee schedule (England, April 2025). Rules change; we confirm the position for your property at the site visit.
Every extension needs Building Regulations approval regardless of planning. This covers foundations (in North London's clay, often 1 m or deeper, and deeper still near trees), structural steel where the rear wall is opened up, thermal performance of walls, roof and glazing (Approved Document L), drainage, ventilation, electrics and fire safety. We submit a full plans application with structural calculations so the design is approved before work starts, and building control inspects at foundation, drainage, structure, insulation and completion stages.
Because most North London extensions sit on or near a boundary, the Party Wall etc. Act 1996 usually applies: building on the line of junction, cutting into a party wall to bear a steel, or excavating within 3 m of a neighbour's foundations (6 m in some cases) all require notice — two months' notice for work to a party wall, one month for new walls and excavation. Neighbours who dissent, or who do not reply within 14 days, trigger the appointment of surveyors and a party wall award. We advise on notices early so it never holds up the programme.
Site visit and feasibility, then design and the planning route, then technical drawings and a fixed price, then construction — typically 10 to 16 weeks on site for a single-storey extension and 14 to 24 weeks for a double storey. The process page sets out all ten stages and what you receive at each. Most extensions can be built with the family living in the house; we seal the site from the rest of the home and keep a temporary kitchen running where we can.
Cost guide · figures current as of September 2026
| Item | Typical range | Notes |
|---|---|---|
| Build cost per m², shell and basic finish (North London) | £2,800 – £4,500 / m² | Higher end for complex structure, high glazing ratios and premium finishes |
| Single-storey rear extension, 20–30 m² | £70,000 – £130,000 | |
| Side return extension, 10–15 m² | £55,000 – £95,000 | Small area, but full structural opening and roof |
| Wraparound extension, 30–45 m² | £100,000 – £180,000 | |
| Double storey extension, 40–60 m² | £120,000 – £220,000 | |
| Kitchen (units, worktops, appliances, fitting) | £15,000 – £45,000 | In addition to build cost |
| Design, structural engineering and approvals | 8 – 12% of build cost | |
| VAT | 20% | Applies to most extension work; some new-build and conversion work is zero- or reduced-rated |
These are market ranges for North London, excluding VAT, professional fees and the kitchen unless stated. They are a guide for planning a budget, not a quotation: ground conditions, access, structure, glazing and finishes move the figure substantially. We give a proper estimate after a site visit.
What could your house extensions project cost?
Use our project calculatorSources: Architecture for London — House extension costs in London (2026 update); Checkatrade — House extension cost guide 2026; Planning Portal — Application fees, England. Market guides only — not a Milkov & Son quotation.
Stages overlap where they can. We agree a programme in writing before work starts — see how a project runs.
As a market guide, £2,800 to £4,500 per square metre for the build, so a typical 25 m² single-storey rear extension is £70,000 to £130,000 before VAT, professional fees and the kitchen. Double-storey extensions of 40–60 m² typically run £120,000 to £220,000. Figures depend heavily on structure, glazing, ground conditions and finishes.
Allow three to five months for design and approvals, then 10 to 16 weeks on site for a single-storey extension and 14 to 24 weeks for a double storey. A whole project from first meeting to finished room is commonly seven to twelve months.
Often, if you live in a house (not a flat) outside an Article 4 area: single-storey rear extensions up to 3 m (terraced/semi) or 4 m (detached), or 6 m/8 m with prior approval, within height and coverage limits. Wraparounds, most double-storey extensions and anything in a restricted area need a planning application.
Usually. Building up to or on the boundary, bearing steels into a shared wall, or digging within 3 m of a neighbour's foundations all fall under the Party Wall etc. Act 1996. Notices must be served before work starts; we advise on timing and can recommend surveyors.
In North London a well-designed kitchen extension usually adds more than it costs, but not always. Value depends on the ceiling price for the street, how much garden is left and whether the layout works. We are candid about this at feasibility — see our guide on whether every extension adds value.
For most single-storey and side-return extensions, yes. We separate the site from the house with a sealed partition and set up a temporary kitchen. Double-storey extensions and extensions combined with a full renovation are easier with the house empty.
Yes. We price and build from other practices' drawings, and we will review them for buildability and cost before you commit.
Read before you build

Extensions
Everything a first-time extender in North London needs in one place: the extension types, what they cost in 2026, permitted development versus planning, Building Regulations, party walls, timelines and how to choose a builder.
27 August 2025 · 6 min read

Extensions
A single-storey extension takes 10–16 weeks on site and a double storey 14–24 weeks, after three to five months of design and approvals. The milestones from feasibility to handover, and what delays them.
21 May 2025 · 6 min read

Extensions
Rear, side return, wraparound, double storey, loft and basement compared: space gained, 2026 cost, planning route, disruption and which North London houses each suits.
16 September 2025 · 8 min read
Based in Hendon, we work across North London and the Hertfordshire border. Each area page covers the local housing stock, planning context and the kind of work we do there.
All areas
Feasibility, design, approvals and construction under one contract, with one person accountable for the result.

Dormer, hip-to-gable, L-shaped and mansard conversions that add a bedroom and bathroom without touching the garden.

Whole-house refurbishments and reconfigurations of 1930s, Edwardian and Victorian homes, managed as one project.

Feasibility, concept design, planning applications and Building Regulations drawings, priced with construction in mind.
Discuss your project
Send a few details about the property, what you want to achieve and your approximate budget. Stoyan reads every enquiry and replies within one working day.
What happens next: a short call, a site visit if it is a good fit, then a written proposal. No charge, no obligation.