Full-width single-storey rear extension and rear dormer at Arlington Road, a 1930s semi in North London

House extensions in North London

House Extensions

Rear, side return, wraparound, double storey and kitchen extensions — designed, approved and built by one team.

A house extension adds floor area to an existing home by building outwards — to the rear, the side, or both — or upwards over part of the existing footprint. In North London the most common briefs are a full-width rear extension to create a kitchen-dining room on the garden, a side-return infill on a Victorian or Edwardian terrace, and a double-storey extension that adds a bedroom above a larger living space.

Milkov & Son designs, obtains approvals for and builds extensions across Barnet, Harrow, Hertsmere and the surrounding boroughs. This page explains what each type involves, what the planning rules allow, what an extension costs in 2026 and how long it takes, so you can make decisions with real numbers in front of you.

Who this suits

  • 1930s semi-detached and detached houses in Hendon, Finchley, Mill Hill, Edgware and Totteridge with narrow kitchens and unused side passages
  • Victorian and Edwardian terraces in Finchley, Muswell Hill, Highgate and Crouch End with a side return to infill
  • Families who need a kitchen-dining-living space that opens onto the garden
  • Households that need a bedroom or bathroom as well as living space (double storey)
  • Homeowners weighing an extension against moving — see our guide on that decision

Types of house extension we build

Each type has its own structural, planning and cost logic. The dedicated pages go into detail; in brief:

  • Rear extensions — the most common. A single-storey addition across the back of the house, usually for a kitchen-dining space, with large glazed doors to the garden.
  • Side return extensions — infilling the narrow passage beside a terraced house to widen the kitchen. Small in area, large in effect.
  • Wraparound extensions — a rear and side extension combined into one L-shaped space; the biggest ground-floor transformation.
  • Double storey extensions — adding living space below and a bedroom or bathroom above; the most cost-efficient way to add area per pound.
  • Kitchen extensions — any of the above, designed around the kitchen as the centre of the house.

Do you need planning permission for an extension?

Many single-storey extensions in England can be built under permitted development rights without a planning application, provided the house is not a flat, is not in a conservation area with an Article 4 direction, and has not already used its allowance. The key limits, taken from the Planning Portal (Town and Country Planning (General Permitted Development) (England) Order 2015, Class A):

RuleDetached houseSemi-detached or terraced
Single-storey rear extension depth (standard PD)4 m3 m
Single-storey rear depth with prior approval ("larger home extension")8 m6 m
Maximum height, single storey4 m (3 m at the eaves if within 2 m of a boundary)
Two-storey rear extensionMax 3 m deep; not within 7 m of the rear boundary; roof pitch to match
Side extensionSingle storey, max 4 m high, no wider than half the width of the original house
Total coverageExtensions and outbuildings may not cover more than 50% of the land around the original house
MaterialsSimilar in appearance to the existing house

"Original house" means the house as first built or as it stood on 1 July 1948. Previous extensions count against the allowance. On designated land — conservation areas such as Hampstead Garden Suburb, Totteridge, Mill Hill and Monken Hadley in Barnet, or Harrow on the Hill — side extensions and two-storey rear extensions need planning permission, and Article 4 directions can remove permitted development altogether. Flats and maisonettes have no permitted development rights for extensions.

Wraparounds, double-storey extensions on most houses, anything on a flat, and anything in an Article 4 area will need a householder planning application (fee £258 in England; the council has eight weeks from validation to decide). Even where a scheme is permitted development we recommend applying for a Lawful Development Certificate (£129) so there is formal proof when you sell or remortgage. We handle all of this as part of the design stage — see architectural design and planning.

Sources: Planning Portal, "Extensions — planning permission"; Planning Portal fee schedule (England, April 2025). Rules change; we confirm the position for your property at the site visit.

Building Regulations, structure and party walls

Every extension needs Building Regulations approval regardless of planning. This covers foundations (in North London's clay, often 1 m or deeper, and deeper still near trees), structural steel where the rear wall is opened up, thermal performance of walls, roof and glazing (Approved Document L), drainage, ventilation, electrics and fire safety. We submit a full plans application with structural calculations so the design is approved before work starts, and building control inspects at foundation, drainage, structure, insulation and completion stages.

Because most North London extensions sit on or near a boundary, the Party Wall etc. Act 1996 usually applies: building on the line of junction, cutting into a party wall to bear a steel, or excavating within 3 m of a neighbour's foundations (6 m in some cases) all require notice — two months' notice for work to a party wall, one month for new walls and excavation. Neighbours who dissent, or who do not reply within 14 days, trigger the appointment of surveyors and a party wall award. We advise on notices early so it never holds up the programme.

Design considerations that make or break an extension

  • Light in the middle of the plan. A deep rear extension pushes the original rooms further from the garden. Rooflights over the old rear wall line, a side window, or a glazed roof strip keep the centre of the house bright.
  • Ceiling height and floor levels. Aim for 2.5–2.7 m clear; drop the floor if the garden is lower rather than stepping down inside.
  • Junction with the old house. Where the new steel meets the old wall is where extensions look either seamless or bolted on. Decide early whether the extension should match the house or be deliberately different.
  • Overheating. Large south- or west-facing glazing needs shading, opening rooflights or solar-control glass; Building Regulations now take summer comfort seriously.
  • Services. Moving the kitchen means moving drainage, gas and often the boiler. Plan the utility room and the plant at design stage, not on site.
  • The garden that is left. A 6 m extension on a 12 m garden leaves very little. Sometimes a smaller extension plus a loft conversion is the better answer.

How an extension project runs

Site visit and feasibility, then design and the planning route, then technical drawings and a fixed price, then construction — typically 10 to 16 weeks on site for a single-storey extension and 14 to 24 weeks for a double storey. The process page sets out all ten stages and what you receive at each. Most extensions can be built with the family living in the house; we seal the site from the rest of the home and keep a temporary kitchen running where we can.

Common mistakes we help clients avoid

  • Commissioning planning drawings before anyone has priced the idea.
  • Ignoring the 50% curtilage rule, previous extensions or an Article 4 direction, then being refused.
  • Under-specifying foundations near trees, which building control will not accept and which costs more to fix mid-dig.
  • Choosing the kitchen after the drainage has been laid.
  • Leaving neighbours until the week before work starts — party wall disputes are the most common cause of delay we see.
  • Allowing no contingency. We recommend 10% on a straightforward extension and 15% on an older house.

Cost guide · figures current as of September 2026

What house extensions cost in North London

ItemTypical rangeNotes
Build cost per m², shell and basic finish (North London)£2,800 – £4,500 / m²Higher end for complex structure, high glazing ratios and premium finishes
Single-storey rear extension, 20–30 m²£70,000 – £130,000
Side return extension, 10–15 m²£55,000 – £95,000Small area, but full structural opening and roof
Wraparound extension, 30–45 m²£100,000 – £180,000
Double storey extension, 40–60 m²£120,000 – £220,000
Kitchen (units, worktops, appliances, fitting)£15,000 – £45,000In addition to build cost
Design, structural engineering and approvals8 – 12% of build cost
VAT20%Applies to most extension work; some new-build and conversion work is zero- or reduced-rated

These are market ranges for North London, excluding VAT, professional fees and the kitchen unless stated. They are a guide for planning a budget, not a quotation: ground conditions, access, structure, glazing and finishes move the figure substantially. We give a proper estimate after a site visit.

What could your house extensions project cost?

Use our project calculator

Sources: Architecture for London — House extension costs in London (2026 update); Checkatrade — House extension cost guide 2026; Planning Portal — Application fees, England. Market guides only — not a Milkov & Son quotation.

How long it takes

  1. 01Feasibility and design4–8 weeks
  2. 02Planning decision (if an application is needed)8 weeks from validation
  3. 03Technical design, structural calcs, Building Regulations3–6 weeks
  4. 04Party wall notices1–2 months' notice, run in parallel
  5. 05On site — single storey10–16 weeks
  6. 06On site — double storey14–24 weeks

Stages overlap where they can. We agree a programme in writing before work starts — see how a project runs.

Frequently asked questions

How much does a house extension cost in North London in 2026?

As a market guide, £2,800 to £4,500 per square metre for the build, so a typical 25 m² single-storey rear extension is £70,000 to £130,000 before VAT, professional fees and the kitchen. Double-storey extensions of 40–60 m² typically run £120,000 to £220,000. Figures depend heavily on structure, glazing, ground conditions and finishes.

How long does a house extension take?

Allow three to five months for design and approvals, then 10 to 16 weeks on site for a single-storey extension and 14 to 24 weeks for a double storey. A whole project from first meeting to finished room is commonly seven to twelve months.

Can I extend under permitted development?

Often, if you live in a house (not a flat) outside an Article 4 area: single-storey rear extensions up to 3 m (terraced/semi) or 4 m (detached), or 6 m/8 m with prior approval, within height and coverage limits. Wraparounds, most double-storey extensions and anything in a restricted area need a planning application.

Do I need a party wall agreement for an extension?

Usually. Building up to or on the boundary, bearing steels into a shared wall, or digging within 3 m of a neighbour's foundations all fall under the Party Wall etc. Act 1996. Notices must be served before work starts; we advise on timing and can recommend surveyors.

Will an extension add value to my house?

In North London a well-designed kitchen extension usually adds more than it costs, but not always. Value depends on the ceiling price for the street, how much garden is left and whether the layout works. We are candid about this at feasibility — see our guide on whether every extension adds value.

Can we stay in the house during the build?

For most single-storey and side-return extensions, yes. We separate the site from the house with a sealed partition and set up a temporary kitchen. Double-storey extensions and extensions combined with a full renovation are easier with the house empty.

Do you build extensions from my architect's drawings?

Yes. We price and build from other practices' drawings, and we will review them for buildability and cost before you commit.

House Extensions across North London

Based in Hendon, we work across North London and the Hertfordshire border. Each area page covers the local housing stock, planning context and the kind of work we do there.

All areas

Discuss your project

Discuss a house extensions project

Send a few details about the property, what you want to achieve and your approximate budget. Stoyan reads every enquiry and replies within one working day.

What happens next: a short call, a site visit if it is a good fit, then a written proposal. No charge, no obligation.