Rear extensions in North London
Single-storey rear extensions that turn a narrow kitchen into a kitchen-dining room on the garden.
A rear extension extends the back of the house into the garden, most often as a single storey across the full width of the property. It is the extension type we build most, because it solves the problem most North London houses share: a kitchen at the back that is too small, cut off from the dining room and from the garden.
A well-planned rear extension of 20–30 m² gives a family one bright room for cooking, eating and living, with the old kitchen becoming a utility, a snug or a study.
Under permitted development a single-storey rear extension may project 3 m from the original rear wall of a terraced or semi-detached house and 4 m from a detached house, with a maximum height of 4 m (3 m at the eaves within 2 m of a boundary). Through the larger home extension prior-approval route, those depths increase to 6 m and 8 m: you notify the council, neighbours are consulted for 21 days, and the council has 42 days to confirm whether prior approval is needed and granted. Extensions on designated land, on flats, or beyond these limits need a planning application. Note that a rear extension on a house with an existing outrigger is measured from the outrigger's rear wall on that part of the house, which is why side-return and wraparound schemes on terraces are often planning applications rather than PD.
Source: Planning Portal, extensions — planning permission; GPDO 2015 Schedule 2 Part 1 Class A.
Opening the rear wall means a steel beam (often two, with a "goalpost" frame where the side wall is also removed) sized by a structural engineer and bearing on padstones or new piers. Foundations in Barnet and Harrow clay are typically 1 m or more deep, and deeper near trees under building control's foundation-depth guidance; where a drain runs under the extension it is either diverted or bridged with a build-over agreement from Thames Water. Roofs are usually a warm flat roof with a single-ply or GRP membrane and one or more rooflights, or a low-pitched roof to match the house.
Sliding doors give bigger panes and a cleaner look; bi-folds open the whole wall but stack in a bundle at one end. Both should be thermally broken aluminium with a threshold detail that keeps water out and lets the floor run level to the terrace. Rooflights over the old rear wall line stop the middle of the house going dark. Where the extension faces south or west, specify solar-control glass or external shading — Building Regulations and common sense both point the same way.
10 to 16 weeks is typical: two weeks of groundworks and foundations, three to four weeks of structure and roof, then glazing, first fix, plastering, second fix, kitchen and decoration. We hoard the site from the house so you can live in it, and we keep the old kitchen running until the new one is ready wherever the layout allows. Skips, scaffold and deliveries are arranged around parking restrictions on the street.
Cost guide · figures current as of September 2026
| Item | Typical range | Notes |
|---|---|---|
| Single-storey rear extension, 20 m² | £60,000 – £95,000 | |
| Single-storey rear extension, 30 m² | £85,000 – £135,000 | |
| Bi-fold or sliding doors, per set | £6,000 – £15,000 | Depends on width, finish and glass specification |
| Kitchen, supply and fit | £15,000 – £45,000 | |
| Design, engineering and approvals | 8 – 12% of build cost |
North London market ranges excluding VAT and fees. A proper estimate follows a site visit.
What could your rear extensions project cost?
Use our project calculatorSources: Architecture for London — extension costs 2026; Checkatrade — extension cost guide 2026. Market guides only — not a Milkov & Son quotation.
Stages overlap where they can. We agree a programme in writing before work starts — see how a project runs.
3 m for a terraced or semi-detached house and 4 m for a detached house under standard permitted development; up to 6 m and 8 m respectively through the larger home extension prior-approval process, subject to neighbour consultation. Flats and homes in Article 4 areas are excluded.
Typically £60,000 to £135,000 for 20–30 m² in 2026, excluding VAT, professional fees and the kitchen. Glazing, structure and ground conditions are the main variables.
It can, if the roof is solid and the extension is deep. Rooflights along the old rear wall, a glazed roof strip or a side window solve it; we model daylight at design stage.
If you build on or up to the boundary, excavate within 3 m of a neighbour's foundations or bear steels into a shared wall, yes. Notices are served one or two months before work starts depending on the type of work.
Read before you build

Extensions
A rear extension adds depth; a wraparound adds depth and width by including the side return, creating an L-shaped room. Space, light, planning (PD versus application), cost and disruption compared for North London houses.
23 July 2025 · 6 min read

Extensions
In many London homes, especially those in terraced or semi-detached areas, space can feel limited. Families grow, lifestyles evolve, and what once felt like…
5 November 2025 · 7 min read

Extensions
Rear extensions are one of the most popular ways to improve a property. They create extra space, allow for larger kitchens and dining areas, improve natural…
13 May 2026 · 10 min read
Based in Hendon, we work across North London and the Hertfordshire border. Each area page covers the local housing stock, planning context and the kind of work we do there.
All areas
Rear, side return, wraparound, double storey and kitchen extensions — designed, approved and built by one team.

Feasibility, design, approvals and construction under one contract, with one person accountable for the result.

Dormer, hip-to-gable, L-shaped and mansard conversions that add a bedroom and bathroom without touching the garden.

Feasibility, concept design, planning applications and Building Regulations drawings, priced with construction in mind.
Discuss your project
Send a few details about the property, what you want to achieve and your approximate budget. Stoyan reads every enquiry and replies within one working day.
What happens next: a short call, a site visit if it is a good fit, then a written proposal. No charge, no obligation.