Whole-house refurbishment with rear extension and loft conversion
Hill Crescent
Totteridge, North London N20

House renovations in North London
Whole-house refurbishments and reconfigurations of 1930s, Edwardian and Victorian homes, managed as one project.
A house renovation (or refurbishment) renews an existing home: its layout, structure, services, kitchens, bathrooms and finishes, in whatever combination the house needs. A full renovation typically means the house is stripped back to its shell — rewired, re-plumbed, re-plastered — with walls moved to suit how the family lives, and everything finished at once rather than room by room over years.
Milkov & Son has renovated North London houses since 2010: 1930s semis in Hendon and Finchley, Edwardian villas in Muswell Hill, Victorian terraces, and larger detached houses in Totteridge, Mill Hill and Radlett. Hill Crescent and Arlington Road show the scale of change a renovation can make.
Partial renovations — a ground floor, or kitchen-bathrooms-rewire — are common too, and we plan them so later phases do not undo earlier work.
Barnet, Haringey, Camden and Harrow are full of houses built between 1880 and 1939, and they share traits that shape a renovation: solid 9-inch walls without cavities, suspended timber ground floors, lime plaster and lath, original slate or clay-tile roofs, and lead or iron services. Good renovation respects the building's construction — breathable insulation on solid walls, repaired rather than replaced sash windows where planning requires it, and structural openings sized for the loads a Victorian wall actually carries. In conservation areas (Hampstead Garden Suburb, Totteridge, Mill Hill, Muswell Hill, Highgate) external changes need planning permission and Article 4 directions may control windows, doors, roofing and render. See our guide to the renovation challenges unique to period properties.
Internal alterations to a house do not need planning permission (listed buildings excepted), but Building Regulations apply to structural work, electrical work (Part P), new bathrooms and drainage, replacement windows (FENSA or building control), and thermal upgrades to more than 25% of any element. External changes — new windows to the front, render, a porch, roof alterations — may need permission in conservation areas or under Article 4. Flats have additional constraints: a licence to alter from the freeholder, and no permitted development rights.
A full renovation with rewiring, new plumbing and structural changes is faster, cheaper and far less stressful with the house empty: trades can work in every room, floors can come up, and there is no dust-management overhead. For partial renovations we phase the work so a bathroom and a kitchen are always usable. We tell clients honestly which applies at feasibility; the guide on living at home during construction covers what to expect.
Cost guide · figures current as of September 2026
| Item | Typical range | Notes |
|---|---|---|
| Light refurbishment — decoration, flooring, new kitchen and bathrooms, no structural or services work | £800 – £1,200 / m² | |
| Mid-range full renovation — rewire, re-plumb, layout changes, new kitchen and bathrooms, quality finishes | £1,200 – £1,800 / m² | |
| High-specification renovation — structural reconfiguration, premium materials, bespoke joinery | £1,800 – £2,500+ / m² | |
| Typical 3-bed semi (c.110 m²), mid-range full renovation | £130,000 – £200,000 | |
| Typical 4/5-bed detached (c.180–220 m²), high specification | £320,000 – £550,000+ | |
| Design, structural engineering and approvals | 6 – 10% of build cost | |
| Contingency we recommend | 10 – 15% |
North London market ranges for 2026, excluding VAT and professional fees. Renovation costs vary more than extensions because the starting condition varies; the survey is what turns a range into an estimate.
What could your house renovations project cost?
Use our project calculatorSources: Bradley Van Der Straeten Architects — House renovation costs London, 2026 cost per m²; Checkatrade — House renovation cost guide 2026. Market guides only — not a Milkov & Son quotation.
Stages overlap where they can. We agree a programme in writing before work starts — see how a project runs.
As a 2026 guide, £1,200 to £1,800 per square metre for a mid-range full renovation and £1,800 to £2,500 or more for high specification, so a typical 110 m² three-bedroom house is £130,000 to £200,000 plus VAT and fees. Light refurbishment without structural or services work is £800 to £1,200 per square metre.
Typically 12 to 18 weeks on site for a three-bedroom house and five to eight months for a large house with structural changes, after six to ten weeks of survey, design and specification.
Not for internal work, unless the building is listed. External changes such as new front windows, render, a porch or roof alterations may need permission in conservation areas or where an Article 4 direction applies. Building Regulations approval is needed for structural, electrical, drainage, glazing and thermal work regardless.
In UK usage they overlap. Refurbishment usually means renewing finishes and services; renovation covers that plus repair and modernisation; remodelling implies changing the layout. Most whole-house projects involve all three.
Together, ideally. Designing the extension and renovation as one project means the services, floor levels and finishes run through the whole house, and you pay for scaffold, skips and disruption once.
Yes, subject to the lease. Most leases require the freeholder's consent (a licence to alter) for structural or layout changes, and flats have no permitted development rights, so external changes need planning permission.
Read before you build

Renovations
How to plan a whole-house renovation in North London: survey, brief, budget (with 2026 £/m² figures), design, approvals, contract, living arrangements and sequencing, from a design-and-build team that does it every year.
25 August 2025 · 6 min read

Renovations
Skips and scaffold, party wall surveyors, building control fees, temporary accommodation, consumer-unit upgrades, VAT and contingency: the refurbishment costs that are missing from most budgets, with 2026 figures.
13 October 2025 · 7 min read

Renovations
A whole-house refurbishment of a three-bed takes 12–18 weeks on site; a large house with structural work five to eight months, after six to ten weeks of survey and design. The stages and what stretches them.
10 July 2025 · 8 min read
Based in Hendon, we work across North London and the Hertfordshire border. Each area page covers the local housing stock, planning context and the kind of work we do there.
All areas
Feasibility, design, approvals and construction under one contract, with one person accountable for the result.

Rear, side return, wraparound, double storey and kitchen extensions — designed, approved and built by one team.

Kitchens, bathrooms, joinery, lighting and finishes designed with the architecture and delivered by the same team.

Dormer, hip-to-gable, L-shaped and mansard conversions that add a bedroom and bathroom without touching the garden.
Discuss your project
Send a few details about the property, what you want to achieve and your approximate budget. Stoyan reads every enquiry and replies within one working day.
What happens next: a short call, a site visit if it is a good fit, then a written proposal. No charge, no obligation.